The Congressman William L. Clay Sr. Bridge, formerly known as the Bernard F. Dickmann Bridge and popularly as the Poplar Street Bridge or PSB, completed in 1967, is a 647ft deck girder bridge across the Mississippi River between St. Louis, Missouri, and East St. Louis, Illinois. The bridge arrives on the Missouri shore line just south of the Gateway Arch.Planned just before construction of the Arch, the builders in 1959 were to request that 25acre of the Gateway Arch property be turned over from the National Park Service for the bridge. The request generated enormous controversy and ultimately 2.5acre of the Jefferson Expansion National Memorial (which included all of the original platted area of St. Louis when it was acquired in the 1930s and 1940s) was given to the bridge.Two Interstates and a U.S. Highway cross the entire bridge. Approximately 100,000 vehicles daily cross the bridge daily, making it the second most heavily used bridge on the river, after the I-94 Dartmouth Bridge in Minneapolis, Minnesota. Some of that load has been diverted to the Stan Musial Veterans Memorial Bridge.Interstate 55 (I-55), I-64 and U.S. Route 40 (US 40) cross the Mississippi on the Poplar Street Bridge. US 66 also ran concurrently over this bridge until 1979, and US 50 was routed over it before the Interstates were constructed. In addition, I-70 crossed the river here until 2014, when it was realigned to cross the river on the Stan Musial Veterans Memorial Bridge when it was completed. I-44 now follows the old alignment of I-70 through downtown to the west approach for the Stan Musial Veterans Memorial Bridge although motorists traveling east on I-44 must continue west on I-70 and do not have a direct connection to the bridge. The traffic was heavily congested until the opening of the new bridge in early February 2014. In 2012, 123,564 vehicles used it every day, but after the new bridge opened, congestion alleviated by almost 14%, less than the predicted 20% decline with 106,500 vehicles using it every day because total traffic across the river from all bridges increased by 7.4% over 2013 levels.
PRICING AND STORAGE FEES: Flatbed Per Vehicle $50.00 Wheel lift Per Vehicle $50.00 First 5 Miles Are Free. $2.00 Per Mile After That Winching Fee Per Hour Per Truck $60.00 On Scene Cleanup Fee Per Hour Man Hour $40.00 On Scene Waiting Time Per Truck $60.00 Per Hour Fuel Delivery Pump Price Plus $20.00 Jump Start $20.00 Daily Storage Fees Per Car $25.00 Per Day Daily Commercial Vehicle Storage Fee Per Day Per Vehicle $60.00 Fleet Rates For Commercial Customers WE ALSO BUY SCRAP CARS AT A FAIR PRICE NO HAUL AWAY FEES